Safe urban designated pedestrian walk and cycling lanes will be integrated.

Promise Tracking Details

Indicator (K): Kilometre length of new safe, designated pedestrian walk and cycling lanes successfully integrated into the urban transport network.
Target (L): Target unspecified. Fulfilment is judged by a measurable increase in non-motorised transport usage and a reduction in pedestrian/cyclist accidents in urban areas.
Delivery Method (M): Policy / Directive issued, Study / Research / Strategy development
Sub-sector (I): Road safety / Safe road systems
Location/Context (D): Manifesto / Document – written form.
Source Type (C): Manifesto
Evidence Links (P): View evidence