ANT 2026-2031 manifesto; Pg. 55
An interface between trams on light rail and buses will move people between residences, workplaces, business markets, schools, health centres, and other destinations.
Promise Tracking Details
Indicator (K): Design, construction, and operationalisation of the dedicated interface infrastructure linking the light rail/tram system with the public bus network, tracked by the number of key destinations (residences, workplaces, schools, health centres, etc.) directly connected by the integrated system.
Target (L): Operationalisation of the light rail and bus interface system for passenger transfer in the Greater Kampala Metropolitan Area (GKMA).
Delivery Method (M): Budget allocation / Appropriation, Programme / Project rollout, Study / Research / Strategy development
Sub-sector (I): Urban transport systems
Location/Context (D): Manifesto / Document – written form.