Track the pledges. Hold the candidates accountable.
ANT 2026-2031 manifesto; Pg. 66
Boost compliance with groundwater and surface water abstraction through proper management of permit conditions.
Promise Tracking Details
Indicator (K): Implementation of enhanced management protocols for water abstraction permit conditions, tracked by the percentage increase in permit compliance rates.
Target (L): Target unspecified. Fulfilment is judged by a measurable reduction in illegal water abstraction from groundwater and surface water sources.