Tarmac all Yumbe roads that are in a very bad or poor state.

Promise Tracking Details

Indicator (K): Kilometres of Yumbe roads tarmacked or upgraded from poor/very bad condition.
Target (L): Target unspecified. Assessment based on completion of tarmacking or major upgrades on all identified poor and very bad roads within the electoral term.
Delivery Method (M): Budget allocation / Appropriation
Sub-sector (I): Road construction & maintenance
Location/Context (D): Rally / Public event – physical campaign event
Source Type (C): Campaign Speech
Evidence Links (P): View evidence