Establish a water supply project to channel water from River Semuliki and Lake Albert to prevent flooding from rising water levels.

Promise Tracking Details

Indicator (K): Progress in construction and operationalisation of the water supply project from River Semuliki and Lake Albert annually.
Target (L): Operational water channels that prevent flooding from rising water levels within 2026–2031.
Delivery Method (M): Programme / Project rollout
Sub-sector (I): Environmental conservation & biodiversity
Location/Context (D): Interview – broadcast or print interview.
Source Type (C): Media Interview
Evidence Links (P): View evidence