Track the pledges. Hold the candidates accountable.
NUP rallies in Kabale and Rukiga districts
Work on the road network in the areas, as many of the roads are muddy and impassable.
Promise Tracking Details
Indicator (K): Measurable increase in the total length of the road network in the designated areas classified as paved, graveled, or maintained (passable).
Target (L): % of the currently muddy and impassable road network in the designated areas upgraded and made motorable.